Renovation Checkpoint

Almost three weeks have passed since I got the keys to my new home. So far I’ve only accomplished

  1. Taking down kitchen cabinets and sink
  2. Painting whole house
  3. Changing sockets and switches
  4. Bought kitchen hood & hob, sink
  5. Ordered dining table.

Still lots more either in progress or still looking…

  1. Built in kitchen cabinets, wardrobes and shoe racks (In progress)
  2. Air conditioning (Looking for quotes)
  3. Varnish parquet (Quoted, will proceed soon)
  4. Refurbish and install existing aluminium grilles (Looking for quotes)
  5. Install fixed ceiling lighting
  6. Beds
  7. Washing Machine and Fridge (Looking for quotes)
  8. Water heater (Looking for quotes)

The above are just essential items that needs to be completed before I can move in and it’s by far a comprehensive list. I’ve even omitted stuff like sofa, coffee table, big ass lcd tv, pots and pans, plates etc.

So many things to do .. so little time..

This entry was posted in My Home. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>